Triton Knoll
Date: 30 Nov 2020
Project Value: £1.6m
Rollins Group were appointed as the M&E contractor in early 2019 & started on site in August 2019. Our in-house CAD/BIM Design team worked with Bam Nuttall and Siemens taking the design from stage4 to construction.
Triton Knoll Wind Farm is a 33 km (21 mi) off the coast of Lincolnshire in the North Sea. Innogy were awarded the lease to the development area in 2003. The offshore wind farm will produce 900MW power. Offshore and onshore export cables will to be energised at up to 220kV for a connection at Bicker Fen Substation which will increase to 400kV. The onshore cable route is 63 kilometres (39 mi) of underground cable. A total investment of £3-4 billion has been secured to deliver the project.
We have been responsible for complete Mechanical & Electrical installation covering:
- HVAC
- BMS with SCADA Integration
- Plumbing
- Mains Distribution
- Complex Containment Systems
- Small Power
- Internal & External Lighting & Control
- Fire Alarm
- Fire Damper System