Project Value: N/A

Rollins Group were approached by Flamingo Flowers (Spalding, Lincolnshire) in June 2020 to design and provide costings for the installation of 5 new loading docks with a completion target date of November 2020. After the tender was successful, we began the design of the intensive project, gained planning permission from the Local Authority, commenced works in early September 2020 and completed for use in mid November. The project saw Rollins Group expand their plant portfolio including the purchase of a JCB 131XLC, earth moving equipment and trailers.

This project emphasises our vast project capabilities and included:

  • Design
  • Planning permissions
  • Building regulations
  • Heavy excavation
  • Pumping chamber relocation
  • Oil interceptors
  • ACO Drainage
  • Heavy brickwork
  • Steel reinforced concrete
  • Armco barriers
  • Insulated panel construction
  • Dock levellers
  • Roller shutters
  • Canopies
  • Traffic lights
  • External and internal lighting
  • HGV lorry guiderails