ADM, Long Sutton
Date: 18 Apr 2019
Project Value: N/A
Pea Cleaning Plant Control System Upgrade, ADM Long Sutton.
- Design and program new control system for the production line.
- Design, manufacture and installation of new control panel including PLC and HMI to replace existing control panel.
- Commissioning and handover of production line to customer.